Prompt Cards

Privacy by Design Checklist
Act as a privacy engineer. Produce a privacy-by-design checklist for a B2B SaaS: data mapping, minimization, retention, encryption at rest/in transit, consent flows, DSR handling, DPIA triggers, regional hosting, and audit trails. Output a table of controls vs owners.
Tags: privacy, security, GDPR, DSR, governance
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
FMEA for Mechatronics Subsystem
As a systems engineer, conduct a DFMEA for a belt-driven actuator with motor, gearbox, encoder: severity-occurrence-detection scoring, top 10 RPNs, mitigations, and verification tests. Provide a compact FMEA table and action list.
Tags: FMEA, mechatronics, actuator, quality, risk
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
First 10 Enterprise Customers Playbook
Act as a founder-CEO. Draft a playbook to win your first 10 enterprise customers: ICP, problem narrative, demo script, proof-of-value plan, security questionnaire readiness, pricing/packaging, legal checklist (DPA, MSA), and mutual action plan template.
Tags: sales, enterprise, pricing, security, legal
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Supplier Qualification & PPAP
You are a manufacturing engineer. Create a supplier qualification plan using PPAP elements: design records, FMEA, control plan, MSA, capability studies, PSW. Include selection criteria, audit checklist, and incoming QC sampling plans (AQL).
Tags: manufacturing, PPAP, suppliers, quality, FMEA
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Observability Minimum Viable Platform
As a platform engineer, design an observability MVP: log, metric, trace standards; correlation IDs; dashboards for latency, errors, saturation; SLOs and burn-rate alerts; incident response runbook; and monthly postmortem review templates.
Tags: observability, SRE, SLO, alerts, runbooks
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Hiring Bar & Loop Design
Act as a CTO. Define the hiring bar and interview loop for your first 5 engineers: competencies, role scorecards, structured interview questions, take-home vs live exercise, rubric with anchored examples, and a 30/60/90 onboarding plan tied to company OKRs.
Tags: hiring, CTO, process, onboarding, OKR
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Tolerance Stack-Up & GD&T
You are a mechanical engineer. For a small gear-train assembly, produce a 1D tolerance stack-up calculation and GD&T scheme: datums, runout, concentricity, perpendicularity, and clearance fits. Show worst-case vs RSS and propose design changes to hit Ppk ≥ 1.67.
Tags: GD&T, tolerance, manufacturing, quality
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
CI/CD for Regulated Customers
Act as a principal engineer. Define a CI/CD pipeline that satisfies SOC 2 and ISO 27001 concerns: branch policies, required reviews, SBOM generation, dependency scanning, SAST/DAST, signing and provenance (SLSA), environment promotion gates, and rollback strategy with change logs.
Tags: security, devops, CI/CD, compliance, SOC2
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Reliability Plan: HALT/HASS
As a reliability engineer, propose a HALT/HASS plan for an IoT gateway (−20 to 60°C, vehicle vibration). Include stress profiles, sample sizes, acceptance criteria, accelerated models (Arrhenius, Coffin-Manson), data sheet limits vs derating, and an engineering change workflow triggered by failures.
Tags: reliability, HALT, HASS, IoT, testing
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Founder Operating Cadence (90-Day)
Act as a CEO coach. Design a 90-day operating cadence for a visionary startup CEO: define north-star metric, 3 company-level objectives, 6 key results, weekly executive meeting agenda, monthly board update outline, and a red/yellow/green health dashboard. Include a template email for investor updates.
Tags: leadership, CEO, OKR, cadence, board
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Mechanical DFM & Cost-Down Plan
You are a mechanical design lead. For a plastic enclosure (150×90×40 mm) made by injection molding at 5k units, produce a DFM checklist and cost-down plan: parting lines, draft angles, wall thickness, ribs, bosses, ejector marks, material selection, mold cavities, target cycle time, cost model (tooling vs per-unit), and risk register.
Tags: mechanical, DFM, cost, BOM, injection molding
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Engineer Scorecard for Product-Market Fit
Act as a staff engineer advising a seed-stage startup. Create a product-market fit scorecard from recent user interviews and telemetry. Include: ICP summary, top 5 pain points, must-have job-to-be-done, success metrics, leading indicators to watch, and a 4-week experiment plan. Return a concise table and a prioritized backlog.
Tags: engineering, PMF, metrics, experiments
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:

Curio AI Brain

Available in Chrome Web Store!