Prompt Cards

Design Controls & Traceability
You are a quality engineer. For a safety-conscious product, define design controls: requirements matrix, verification/validation plan, risk management (ISO 14971 style), and traceability from user needs to tests.
Tags: quality, regulatory, traceability, verification
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Pricing & Packaging Matrix
Act as a GTM-savvy CTO. Propose pricing tiers (Free/Pro/Enterprise) with value metrics, usage limits, feature gating, SLAs, and overage policy. Include a migration plan and win-loss hypotheses to test.
Tags: pricing, packaging, GTM, SLAs, experiments
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Factory NPI Readiness Review
As an NPI lead, generate a factory readiness checklist: work instructions, jigs/fixtures, line balance, first article inspection, SPC charts, yield target, rework loop, and traceability plan (serials, lots). Provide pass/fail gates for EVT/DVT/PVT.
Tags: NPI, manufacturing, quality, SPC, traceability
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Tech Debt Register & Paydown
Act as a principal engineer. Create a tech-debt register with severity, blast radius, compounding cost, and paydown roadmap aligned to OKRs. Include a policy for allocating 15–20% capacity to debt reduction.
Tags: tech debt, architecture, engineering management, OKR
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
CFD/FEA Early Verification Plan
You are a mechanical analysis lead. Outline a lightweight CFD/FEA plan for a heatsink on a 10 W SoC: boundary conditions, mesh strategy, material data, convergence criteria, validation with bench measurements, and reporting format.
Tags: FEA, CFD, thermal, validation, simulation
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Visionary Product Narrative
Act as a founder-CEO. Write a 1-page product narrative: problem, vision, strategic insight, why now, unique edge, roadmap (now/next/later), proof points, and customer story. Keep it crisp and rally the team.
Tags: storytelling, vision, product, roadmap, leadership
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
BOM Cost Roll-Up & Alternates
You are a sourcing engineer. Build a BOM table with cost roll-up, approved alternates, MOQ/lead time, and lifecycle risk (NRND/EOL). Recommend cost-down opportunities and dual-sourcing strategy.
Tags: BOM, procurement, cost, alternates, supply chain
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Security Architecture for First Enterprise Deal
Act as a security architect. Draft a security overview for customer due diligence: network diagram, authN/Z, secrets management, key rotation, audit logging, disaster recovery RTO/RPO, and vulnerability management cadence. Include a concise one-pager summary.
Tags: security, architecture, DR, auth, compliance
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Design for Assembly (DFA) Review
You are a manufacturing engineer. Create a DFA checklist and re-design recommendations to cut assembly time by 30%: fastener reduction, symmetry, poka-yoke, subassembly strategy, tool access, and workstation layout.
Tags: DFA, lean, assembly, manufacturing, efficiency
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Hardware-Software Interface Contract
As a systems architect, define an interface contract between firmware and cloud: message schema, versioning strategy, error codes, retry/backoff, feature flags, and backward compatibility tests. Provide a JSON schema and validation plan.
Tags: architecture, interfaces, firmware, cloud, APIs
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Runway & Unit Economics Model
Act as a CFO-minded CTO. Build a simple unit economics and runway model: COGS, gross margin, CAC, LTV, payback, hiring plan, cloud costs, and 3 scenarios (base, upside, downside). Return a small table plus key assumptions.
Tags: finance, unit economics, runway, pricing, planning
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:
Mechanical Rapid Prototyping Strategy
You are a mechanical lead. Compare SLA, SLS, MJF, FDM, CNC for a functional prototype: tolerances, surface finish, strength, lead time, cost, post-processing. Recommend path to EVT/DVT with gate criteria.
Tags: prototyping, 3D printing, CNC, EVT, DVT
Author: tsubasa
Created at: 2025-11-06 00:00:00
Average Rating:
Total Ratings:

Curio AI Brain

Available in Chrome Web Store!