Prompt Cards

Beta & Pilot Program Design
Define TW/US beta pilots: eligibility, NDAs, telemetry, survey cadence, and success criteria. Include de-risking plan for public GA.
Tags: product, beta, pilot, telemetry, GA, success-metrics
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
Accessibility & Inclusivity Checklist
Provide accessibility guidelines: WCAG for software, color/contrast, captions; hardware tactile feedback and labeling; cultural sensitivity notes for EN/zh-TW.
Tags: accessibility, WCAG, UX, hardware-labels, inclusive
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
Usability Research Panels
Create a research plan: recruit TW and US panels, consent forms, bilingual scripts, and synthesis templates. Include incentives and privacy handling.
Tags: UX, research, panels, tw-us, bilingual, consent
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
Cross-Border Tax & Logistics
Outline tax/logistics basics: US state sales tax handling, Taiwan import/VAT, Incoterms selection, and last-mile options. Provide cost model template.
Tags: ops, logistics, tax, Incoterms, Taiwan, USA
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
Field Data → Roadmap Loop
Design a feedback mechanism: telemetry (opt-in), repair codes, NPS, and sales insights feeding into quarterly product council decisions for TW/US.
Tags: product, roadmap, feedback, telemetry, governance
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
SKU & BOM Governance
Create SKU/BOM control policy: regional SKUs, revisioning, ECO/ECN forms, and ERP integration. Include traceability expectations by factory.
Tags: hardware, SKU, BOM, ECO, ERP, governance
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
Packaging & IFU Localization
Provide packaging/IFU rules: bilingual labels (EN/zh-TW), safety icons, recycling marks, UPC/EAN barcodes, and drop/edge crush tests.
Tags: hardware, packaging, IFU, labels, testing, localization
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
RMA/Field Failure Workflow
Define an RMA process: intake, triage, FA loop, 8D template, and cost recovery. Include US depot vs TW lab routing and customer comms templates.
Tags: hardware, RMA, field-failure, 8D, repair, logistics
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
Manufacturing Test & Yield
Create a station-by-station test plan (ICT/FCT/EOL), yield dashboards, failure Pareto, and stop-ship criteria. Provide bilingual defect codes legend.
Tags: hardware, manufacturing, test, yield, ICT, FCT
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
Firmware OTA & Region Flags
Define firmware architecture for OTA with rollback, staged rollouts, and region-specific feature flags (TW/US). Include signing and key rotation.
Tags: hardware, firmware, OTA, security, rollout, regions
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
Battery & Shipping Compliance
Draft Li-ion safety and shipping guidance: design safeguards, UN 38.3/IATA basics, MSDS docs, and returns handling for US/TW.
Tags: hardware, battery, shipping, UN38.3, IATA, safety
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:
Reliability Test Plan (HALT/HASS)
Create a reliability matrix: drop, vibe, thermal, humidity, ESD. Define sample sizes, pass/fail, and failure analysis routing between TW lab and US field testers.
Tags: hardware, reliability, HALT, HASS, FA, testing
Author: Assistant
Created at: 2025-12-08 00:00:00
Average Rating:
Total Ratings:

Curio AI Brain

Available in Chrome Web Store!