Prompt Cards

BH Spare Parts Min-Max Policy
Create a min-max policy for critical spares in Belo Horizonte. ABC rank, lead time buffers, consignment options, and stock-out risk modeling.
Tags: spares, inventory, ABC, Belo Horizonte, maintenance, policy
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
Suginami Job Instruction (TWI) Rollout
Deploy TWI-JI in Suginami: break down jobs, key points, and reasons; deliver 10-minute training cards; measure learning curve and first-run yield.
Tags: TWI, JI, training, Suginami, standard-work, skills
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
Sagamihara Environmental Monitoring
Set up ambient monitoring in Sagamihara shops: VOCs, particulates, and noise. Specify sensor placement, thresholds, and monthly reporting pack.
Tags: environment, VOC, noise, monitoring, Sagamihara, air
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
Kawasaki Heat Treatment Uniformity
Improve heat treatment uniformity in Kawasaki: load plan, thermocouple mapping, TUS/SAT schedule, and quench agitation tweaks. Output CpK targets.
Tags: heat-treatment, TUS, SAT, CpK, Kawasaki, metallurgy
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
Franca Supplier APQP Lite
Roll out APQP-lite with Franca suppliers. Define control plans, PFMEA, and sample submission requirements. Add a supplier scorecard and escalation rules.
Tags: APQP, PFMEA, control-plan, Franca, suppliers, quality
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
Caxias Forklift Traffic & Safety Plan
Design a traffic plan for Duque de Caxias warehouses: one-way aisles, speed rules, mirrors, pedestrian lanes, and telematics for near-miss tracking.
Tags: forklift, safety, traffic, Duque de Caxias, warehouse
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
BH Industrial Cybersecurity Starter
Build a BH plant OT security baseline: asset inventory, network zones, MFA for remote, backups, and incident playbook. Provide a week-1 hardening checklist.
Tags: OT, cybersecurity, inventory, Belo Horizonte, network, zoning
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
Suginami Rapid Root-Cause (A3 + 5-Why)
Train Suginami engineers on A3 thinking. Run a live 5-Why on a recent defect, define containment, root fix, and validation plan. Produce a shareable A3.
Tags: A3, 5-Why, root-cause, Suginami, problem-solving
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
Sagamihara Power Quality Audit
Audit power quality in Sagamihara (harmonics, dips). Recommend filters, UPS for PLCs, and surge protection. Provide downtime cost impact model.
Tags: power-quality, UPS, PLC, Sagamihara, harmonics, downtime
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
Kawasaki Traceability & Lot Control
Implement end-to-end traceability in Kawasaki: lot IDs, barcode genealogy, and recall drill. Provide DB schema and line label placement plan.
Tags: traceability, barcode, recall, Kawasaki, lot-control
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
Franca Lean Office for Order Entry
Apply lean to Franca office processes handling orders. Map value stream, remove re-entry loops, implement swimlanes, and define SLA and andon triggers.
Tags: lean-office, Franca, order-entry, VSM, SLA, andon
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:
Caxias Cold Chain Mapping
Map the cold chain in a Duque de Caxias food warehouse: temp loggers, door discipline, staging time limits, and alarm escalation. Output loss reduction plan.
Tags: cold-chain, temperature, Duque de Caxias, logistics, food
Author: Assistant
Created at: 2025-12-18 00:00:00
Average Rating:
Total Ratings:

Curio AI Brain

Available in Chrome Web Store!