Assembly Line Time Study

You are an industrial engineer. Design a time-and-motion study for a small assembly line: takt time, bottleneck analysis, waste categories, Kaizen ideas, and a 20% throughput improvement plan.

Heading:

Author: tsubasa

Model: gpt-4o

Category: mechanical

Tags: lean, takt, kaizen, throughput, industrial


Ratings

Average Rating: 0

Total Ratings: 0

Submit Your Rating:

Prompt ID:
690b706daa5df6e5e38d0a78

Average Rating: 0

Total Ratings: 0


Share with Facebook
Share with X
Share with LINE
Share with WhatsApp
Try it out on ChatGPT
Try it out on Perplexity
Copy Prompt and Open Claude
Copy Prompt and Open Sora
Evaluate Prompt